RepMap
FINREP 4.4validation

Releases (DPM and templates)

Annex V text editions

What's new FINREP 4.2.1 → 4.4

A release is the EBA package of templates and rules. A variant is an alternative set of templates inside a release (IFRS 18 replaces some IAS 1 templates). Annex V editions are versions of the instruction text.

v1103_m

warningactivewithin F 00.014 cells · specific checkprecondition on F 00.01

Expression · DPM 2.0, verbatim

with {c0010, interval: true}: if ( {tF_00.01, r0010, default: ""} = [eba_qAS:qx2004] ) then ( {tF_21.00, r0070, default: 0} = sum ({tF_21.00, r0080-0090, default: 0}) ) endif

EBA description if {F 00.01, r0010, c0010} = [eba_AS:x2] then {F 21.00, r0070, c0010} = sum({F 21.00, c0010, (r0080-0090)})

Precondition p_414 (its meaning is not in the data yet)

Cells involved

F 00.01 Nature of Report (FINREP)

Open template →
c0010Nature of Report
0010Accounting frameworkin rule

F 21.00 Tangible and intangible assets: assets subject to operating lease

Open template →
c0010Carrying amount
0070Other intangible assetsin rule
0080Other intangible assets › revaluation modelin rule
0090Other intangible assets › cost modelin rule

Scope by module

ModuleSeverityStatusFrom
FINREP9 3.3.0warningactive2026-03-31
FINREP9DP 1.0.0warningactive2026-03-31
FINREP9DP 1.1.0warningactive2026-03-31