RepMap
FINREP 4.4validation

Releases (DPM and templates)

Annex V text editions

What's new FINREP 4.2.1 → 4.4

A release is the EBA package of templates and rules. A variant is an alternative set of templates inside a release (IFRS 18 replaces some IAS 1 templates). Annex V editions are versions of the instruction text.

CRR — Regulation (EU) No 575/2013 on prudential requirements for credit institutions (Capital Requirements Regulation) · version 2026-06-26 · CELEX 32013R0575 · consolidated text, no legal effect (EUR-Lex)

CRR › Article 501

Article 501 Adjustment of risk-weighted non-defaulted SME exposures

official text, verbatim

1

Institutions shall adjust the risk-weighted exposure amounts for non-defaulted exposures to an SME (RWEA), which are calculated in accordance with Chapter 2 or 3 of Title II of Part Three, as applicable, in accordance with the following formula:

formula (image in the official text)

where:

RWEA*=the RWEA adjusted by an SME supporting factor; and
E* is either of the following:=(a)  the total amount owed to the institution, its subsidiaries, its parent undertakings and other subsidiaries of those parent undertakings, including any exposure in default, but excluding claims or contingent claims secured on residential property collateral, by the SME or the group of connected clients of the SME; (b)  where the total amount referred to in point (a) is equal to 0, the amount of claims or contingent claims against the SME or the group of connected clients of the SME that are secured on residential property collateral and that are excluded from the calculation of the total amount referred to in that point.
2

For the purposes of this Article:

2(a)

the exposure to an SME shall be included either in the retail or in the corporates or secured by mortgages on immovable property exposure classes but excluding ADC exposures;

2(b)

an SME shall have the meaning laid down in Article 5, point (9);

2(c)

institutions shall take reasonable steps to correctly determine E* and obtain the information required under point (b).